Green Infrastructure 2014 - Working Group F: Difference between revisions

From Wikienfk5
Jump to navigation Jump to search
No edit summary
 
Line 29: Line 29:
=== Presentation Slides Assignment 3 ===
=== Presentation Slides Assignment 3 ===


<gallery caption=" " widths="200px" heights="200px" perrow="5">
<gallery caption=" " widths="300px" heights="300px" perrow="5">
Image:Group_F_Slide_1.JPG|slide 1
Image:Group_F_Slide_1.JPG|slide 1
Image:Group_F_Slide_2.JPG|slide 2
Image:Group_F_Slide_2.JPG|slide 2
Line 50: Line 50:
=== Presentation Slides Collaborative Design ===
=== Presentation Slides Collaborative Design ===


<gallery caption=" " widths="150px" heights="150px" perrow="4">
<gallery caption=" " widths="300px" heights="300px" perrow="4">
Image:GI_yourgroupname_ass4_slide1.jpg|Analytical Drawings
Image:Slide1_Darsena.JPG|Analytical Drawings
Image:GI_yourgroupname_ass4_slide2.jpg|Projective Drawings
Image:Slide2_Darsena.JPG|Projective Drawings
Image:GI_yourgroupname_ass4_slide3.jpg|Design Synthesis
Image:Slide3_Darsena.JPG|Design Synthesis
</gallery>
</gallery>



Latest revision as of 08:54, 27 January 2015

--> Back to working group overview

Dear working group members. This is your group page and you will be completing the template gradually as we move through the seminar. Each member has an individual page for documenting his/her personal case. You can also access your template for assignment 4 (the joint design) from here. Good luck and enjoy your collaboration!


Assignment 2 - Lecture Concept Map

  • The list with the group distribution shows you which lecture your group is supposed to document in the concept map format.
  • Please add your collaborative concept map here by replacing the dummy image. Your map needs to have a new file name:

Assignment 3 - Green infrastructure potential in your environment

  • Assigned: Tuesday, October 28
  • Due: Monday, December 1

There is one template page for each group member. The case could be a specific site in direct vicinity or a larger area in your region. The objective is to identify structures that have the potential to become elements of a green infrastructure strategy.

Abdali Bridge

The Darsena Area

Promontory Hill Development

Hashemie Mountain Area

Presentation Slides Assignment 3

Assignment 4 - Collaborative Green Infrastructure Design

  • Assigned: Tuesday, December 2
  • Due: Tuesday, January 26

Collaborative Design Working Group F

Presentation Slides Collaborative Design