Green Infrastructure 2014 Group G - Case Study 2

From Wikienfk5
Jump to navigation Jump to search

---> back to group page working group G

please add your title here


Name Girona river
Country Spain
City Beniarbeig, Ondara, El Verger and Els Poblets
Authors Maria Josep Ripoll
File:Image.png

Rationale: Why is this case interesting?

This is the case of the Girona river. It’s a Mediterranean river in the north of the Marina Alta county in Spain. It is dry most of the year, especially in summer. Girona river connects the mountains from the inside of the county to the coastal plain and the sea. Girona river has a big biodiversity value (fauna, flora and water quality) and close to it there is a protected natural park (a marsh) that gives shelter to different important migratory birds that visit Girona river at times. It preserves some examples of water heritage linked to the historical irrigation systems in the Mediterranean area. The river crosses several towns and infrastructures. It’s potential value is endangered by a lack of environmental awareness in urban planning. In the past, the river was useful and people had a bigger bond with it. Nowadays, It’s thought it’s just a place with no interest or a barrier you need to cross. Moreover, Girona river is known by flash floods, what means that people from downstream area is exposed to an important flood risk.

Author's perspective

what is your professional/educational background and your relation to the site?

Landscape and/or urban context of your case

  • Biogeography, cultural features, overall character, history and dynamics
  • Illustrations: maps; sketches; short descriptive analyses


Analytical drawings

  • Please use analytical drawing for visualising the conflicts/potentials of your site

Green Infrastructure benefits for this site

Look again at the multiple benefits of green infrastructure - what could be achieved in your site and which are most relevant?

Potential for multifunctionality

Green infrastructure has typically multiple functions. What could be achieved for your site in this respect?


Projective drawings

  • How would you like this case to change in the near future? (in 1-2 years)
    • you may add a short explanation here
  • And how could it look like in 10-15 years?
    • you may add a short explanation here

Summary and conclusion

  • 100 words approx.

Image Gallery

Please add further images/photos here

References

  • please add your references here



About categories: You can add more categories with this tag: "", add your categories