Landscape Democracy 2015 Working Group E - Case Study 2
---> back to group page working group E
Please add the title of your case study here, adjust the map coordinates (lat + lng) and replace the moa image with a characteristic image of your site
Place name | add name | |
Location | add location | |
Country | add country | |
Author(s) | add author | |
Rationale: Why have you chosen this case for the landscape and democracy seminar?
- brief explanation in essay style, approx 150 words
Representation of your observations
The aim of this project is to relieve and redistribute the traffic from the center area of Bucharest, facilitating the connection between principal landmarks of the city: North Railway Station, Victory Square (the government location), historical centre, Izvor Sqaure (the Parliament House) and the south part of the city. The project of building this new axis (Buzesti-Uranus) is considered one of the most courageous and highly important urban intervention in the last 20 years in Bucharest regarding the road infrastructure in the central area and the replacement of an urban tissue. Without any public debate or even a town planning document (PUZ - zonal urbanistic plan), public authorities started expropriation and demolition processes in the necessary area for building the new boulevard. Because we are talking about the central and historical area of the city, in this processes were involved a consistent number of protected and historical buildings. One of the most famous and well-known building which has been demolished was Matache The Butcher Hall. After a lot of pressure from the NGO's, public authorities started to design a planning document (PUZ), whose aim was to remedy the mismanagement of the initial phase of the project. The main problems regarding landscape and democracy for this intervention were the public authorities' communication incapacity and the lack of transperancy in the planning process. Besides the public authorities lack of interest in public participation, co-design, placemaking, Romanian law and institutional framework are also inadequate for citizens real needs of these times.
- Yourfilename1.jpg
case representation
- Yourfilename2.jpg
case representation
- Yourfilename3.jpg
case representation
- Yourfilename4.jpg
case representation
Reflection
What are the major challenges for changing the situation?
What could be a starting point for democractically-based change?
- Please add approx. 150 words for each questions
References
http://reteaualiterara.ning.com/profiles/blogs/salvati-piata-matache http://www.activewatch.ro/Assets/Upload/files/Viziune-alternativa-Platforma_pt-primarie-si-CTUAT.pdf http://issuu.com/zeppelin.magazine/docs/dosarul_buzesti-uranus http://sorinoprescu.ro/proiecte/diametrala-buzesti-berzei-uranus http://www.observatorulurban.ro/prezentarea-axei-buzeti-uranus-la-uauim-iii.html http://www.rfi.ro/social-68732-galerie-foto-axa-buze-ti-berzei-uranus-mai-face-o-victim-vezi-ce-spune-nicu-or-dan http://arhitectura-1906.ro/2011/12/dosar-comentat-buzesti-berzei-uranus-invitat-constantin-enache/