Talk:Planting Design 2013 - Working Group 23: Difference between revisions

From Wikienfk5
Jump to navigation Jump to search
No edit summary
No edit summary
Line 17: Line 17:
>there's an imbalance between the drawings and the description
>there's an imbalance between the drawings and the description


>the proposal could have been a little more detail
>the proposal could have been a little more detailed


>in conclusion it is a good case but needed a little bit more work
>in conclusion it is a good case but needed a little bit more work

Revision as of 19:49, 8 January 2014

Feedback from Group 8

Your group seems to have had a good relationship based on communication, as a result the group activity was a productive one. The concept map is fairly detailed and overall the group presentation was good as well.

Case Study A - Union Square, Iasi, Romania

Case Study B - Eko o ni Baje Garden, Lagos

Case Study C - Hudson Road Recovery, Argentina

>good choice for the case study

>the evaluation and the solution are a little too superficial

>there's an imbalance between the drawings and the description

>the proposal could have been a little more detailed

>in conclusion it is a good case but needed a little bit more work