Group O - Collaborative Climate Adaption Project: Difference between revisions

From Wikienfk5
Jump to navigation Jump to search
Line 104: Line 104:
After the 2nd World War II till 1951, in the south of the Nymphenburg Biederstain-channel a 40-meter high pile of debris from the war’s ruins, was dumped. This separated the south-eastern part of the Oberwiesenfeld and the spatial connection between this area (nowadays planning area) and the rest of Oberwiesenfeld is lost.
After the 2nd World War II till 1951, in the south of the Nymphenburg Biederstain-channel a 40-meter high pile of debris from the war’s ruins, was dumped. This separated the south-eastern part of the Oberwiesenfeld and the spatial connection between this area (nowadays planning area) and the rest of Oberwiesenfeld is lost.


In April 1966 in Rome, Munich was decided to host the Olympic Summer Games '72. The pile of debris was used in the landscaping concept of Olympic facilities. The Olympic Park was completed in June 1972.
In April 1966 in Rome, Munich was decided to host the Olympic Summer Games '72. The pile of debris was used in the landscaping concept of Olympic facilities. The Olympic Park was completed in June 1972. Since 1972, the northern (and largest) part of the upper meadow area merged into Munich Olympic Park.


Then for the area under the name "am Ackermannbogen" urban planning began to reflect a part of the Prince Leopold Barracks, both of which are currently completed three sections. After the construction of the first section in the north east of the site, the building of the Department of Military Geography (MilGeo) which had been abandoned by the army then was reconstructed. In 2006/07 the former barracks building in the Stetten barracks were pulled down, whereupon the fourth section will be built next to the student dormitory at Schweren-Reiter street.
Based on the urban contract and development agreement between the property owners and the City of Munich, in the fall of 2002 the first section of the development and the construction of housing in Ackermannbogen started. The northeast neighborhood was constructed under the "Bavarian Future", a residential support program of the Free State of Bavaria, which implemented as a "model village" to try new ways of cost, environmental and social living in Bavaria. Here approximately 630 homes, a mixture of various types of houses and apartments, as well as a daycare center were realized. Another building on the north end of the large lawn with an integrated cooperative system for children is expected to be ready in spring 2007.
The third section (North-West district) is the model project implemented Solar local heating, or solar thermal energy and district heating. Three large underground storage tanks were placed to supply approximately 300 residential units.
In the south (second section), particularly along Schwere-Reiter street and in the northern part of the Adams-Lehmann-street, next to social housing and public service and high-priced condominiums, a health clinic and a day care center are planned.
In the southwest (fourth section, there is a "market square" and the shops and stores are grouped so that the new district is supplied accordingly. In this area there will be sheltered housing for the arising elderly. An existing building on the Schwere-Reiter street was converted into a dormitory. The development plan for the fourth section is still being considered and not decided yet.





Revision as of 01:22, 4 January 2013

Area Munich
Place Ackermannbogen
Country Germany
Topic renewable energy application
Author(s) Cenke Jiang, Andreea Pascu, Le Trang Nguyen
Ackermannbogen overall pic.JPG


Rationale: Why have you selected this case study area?

  • Munich is the capital city of Bavaria, one of Germany's three largest cities with the population of 1.42 million people and has the strongest economy of the whole country. This is a globally cosmopolitan city and also has the leading renewable energy policy.
  • Ackermannbogen is a district of Munich particularly planned to be one of the front-runners of solar district heating. This is a part of the city's aim: 100% renewable energy for Munich in 2015. This area is a perfect practical example of building a green enery system and an innovative concept of intergrating solar heating machines with green space.


Authors' perspectives

We all come from different background, but our aspirations meet where the climate is actually changing and we believe renewable energy and mitigation is the key solution for the future. We chose Ackermannbogen as a project-case study, more than a reality-case study, because it is a great project which was designed and currently being built and continually adjusted for the future. Our aim is to learn from such massive plan and to make our own proposals in the context of pre-designed but considering the factor of climate changing.


Landscape and/or urban context

In the late eighties, the city of Munich laid the foundation stone for a municipal policy committed to promoting renewable sources of energy by emphasising energy saving. As early as 1991, the Munich municipal council decided to concentrate on lowering CO2 emissions by 30% in 2005 and by 50% in 2010. So far, the City of Munich's climate protection policy has respected Kyoto protocol objectives even though this was not the case before they were defined.

Ackermannbogen district is situated within the context of the pre-planning area, Munich Olympic Park. Along with the whole concept of "Green Olympic Games" and the energy saving policy of Munich itself, Ackermannbogen specifically generates solar-powered local heating system with a seasonal heat storage facility has been developed for the Bavarian capital of Munich. The concept actually came from a competition of urban and landscape design ideas in 1998, conducted by the city of Munich. The central idea of the design was to create a community planner broad range of different types of housing - from double or terraced houses to apartment buildings.


Biogeography

Ackermannbogen lies on the elevated plains of Upper Bavaria, about 50 km north of the northern edge of the Alps, at an altitude of about 520 m (1,706.04 ft) ASL. The local rivers are the Isar and the Würm. The geography characteristics are similar to Northern Alpine Foreland. The northern part of this sandy plateau includes a highly fertile flint area which is no longer affected by the folding processes found in the Alps, while the southern part is covered with morainic hills. Between these are fields of fluvio-glacial out-wash, such as around Munich. Wherever these deposits get thinner, the ground water can permeate the gravel surface and flood the area, leading to marshes as in the north of Munich.

One of the significant characteristics of the biogeography of Munich area is: Although the city keeps expanding, not only the population or the accommodations increase but also artificial hills are made and city's forest are planted. Species and natural elements are reserved as much as possible. With the examples of Munich Riem area and the English Garten, the Botanischer Garten München-Nymphenburg, Ackermannbogen district inherits diverse Bavarian biogeography.


Land use

Within the Urban Development Action, till 2014 Ackermannbogen will then cover 39.5 hectares in total:

  • ca. 2250 dwellings
  • Student dormitory
  • Kindergarten
  • Public primary school
  • Private school
  • Medical centre
  • Supermarket
  • Retails, Cafeterias
  • Cultural and neighborhood meeting
  • Bridge Construction
  • 9.2 hectares of public green spaces
  • Large meadow
  • Playground
  • Hills
  • City Forest


Overall character

Lage im Stadtgebet.jpg

The project area is located in the northern part of the district Neuhausen-Oberwiesenfeld in the north of Munich, close to the southern edge of the Olympic site and connects directly to the Schwabing district. It is bounded by the Ackerman Road to the west and north, the Deidesheimer, Saar and Winzererstraße the east and Schwere–Reichter–Straße in the south.

In the south of the Schwere–Reichter–Straße, there is another smaller and still unused barracks (Luitpold barracks), a small, self-contained residential development and several gas stations. Following this is an area with offices and public facilities extends (Infantry, Hess, Loth and Dachauerstraße).

The district Schwabing-West is in the east of the project area is a dense block development area. Further north is the Middle Ring, Frankfurter Ring and the business and industrial belt at Frankfurter Ring Barrier, an urban landscape lying there on the clearance.

This central location is near to the park and also requires attracktive planning for residents and visitors, which is challenging due to the expected high use pressure.


History and dynamics

The history of the whole area comes from the land named Oberwiesenfeld. Since the end of the 19th century, Oberwiesenfeld area had been the landing for balloons and airships, both military and civilian. Till 1902 Prince Luitpold established the Prince Leopold Barracks from Infanterie Road to Schwere-Reiter Road, which forms today the southern tip of the planning area. By the corner of Schwere-Reiter Road and Winzerer Road is the reserved historical buildings, including the Department of Transportation (Straßenbauamt), the State Archives (Staatsarchiv) and a canteen is located.

Adjacent to the planning area to the north of the Dachauer Road was the area of the railway company since 1890, which are currently erected the buildings of Munich’s Military District and Site Management and the district recruiting office. Since 1896, a new barrack was built in the south of Schwere-Reiter Road, at the corner of Heß Road and an airship department was located, which was later expanded to Luitpold barracks by the Nazis. In 1909, a small condominium for army officials was built in the south of Schwere-Reiter Road, at Barbara Road and still reserved till today. Also under the Nazis time the military had added to existing military building regulations: in 1933, the first part of the "motorcycle-shooters-barracks" (Kraftrad-Schützen-Kaserne) was built in the west of existing Prinz-Leopold barrack. Since 1935 the New-corps barrack existed, today known as Waldmann barrack. Here till the 2nd World War was the accommodation of infantries, pioneers, signal corps and drivers. After the end of the 2nd World War, the planning area was only slightly damaged and installed some facilities as emergency shelters for refugees and expellees; they also have been used temporarily for commercial purposes.

The barracks were occupied by U.S. forces from 1945 to the late 50s and then claimed against the Federal Army Force. New supplemental buildings were added gradually to the site of the Stetten barracks in the 60s: Auditorium buildings, dorm and gymnasiums. In the same period in the middle of the site was the central heating plant with brick chimney to look similar to the whole area’s style. The Waldmann barracks were removed from the grounds for that purpose.

Stadtplan Muenchen 1930 Prinz Leopold Kaserne.jpg
Kasernen Neuhausen 1.JPG
Korpsnachrichten Kaserne Munich.jpg


After the 2nd World War II till 1951, in the south of the Nymphenburg Biederstain-channel a 40-meter high pile of debris from the war’s ruins, was dumped. This separated the south-eastern part of the Oberwiesenfeld and the spatial connection between this area (nowadays planning area) and the rest of Oberwiesenfeld is lost.

In April 1966 in Rome, Munich was decided to host the Olympic Summer Games '72. The pile of debris was used in the landscaping concept of Olympic facilities. The Olympic Park was completed in June 1972. Since 1972, the northern (and largest) part of the upper meadow area merged into Munich Olympic Park.

Then for the area under the name "am Ackermannbogen" urban planning began to reflect a part of the Prince Leopold Barracks, both of which are currently completed three sections. After the construction of the first section in the north east of the site, the building of the Department of Military Geography (MilGeo) which had been abandoned by the army then was reconstructed. In 2006/07 the former barracks building in the Stetten barracks were pulled down, whereupon the fourth section will be built next to the student dormitory at Schweren-Reiter street.

Based on the urban contract and development agreement between the property owners and the City of Munich, in the fall of 2002 the first section of the development and the construction of housing in Ackermannbogen started. The northeast neighborhood was constructed under the "Bavarian Future", a residential support program of the Free State of Bavaria, which implemented as a "model village" to try new ways of cost, environmental and social living in Bavaria. Here approximately 630 homes, a mixture of various types of houses and apartments, as well as a daycare center were realized. Another building on the north end of the large lawn with an integrated cooperative system for children is expected to be ready in spring 2007.

The third section (North-West district) is the model project implemented Solar local heating, or solar thermal energy and district heating. Three large underground storage tanks were placed to supply approximately 300 residential units.

In the south (second section), particularly along Schwere-Reiter street and in the northern part of the Adams-Lehmann-street, next to social housing and public service and high-priced condominiums, a health clinic and a day care center are planned.

In the southwest (fourth section, there is a "market square" and the shops and stores are grouped so that the new district is supplied accordingly. In this area there will be sheltered housing for the arising elderly. An existing building on the Schwere-Reiter street was converted into a dormitory. The development plan for the fourth section is still being considered and not decided yet.


Ratio of green/blue and sealed/built-up areas

Illustration: Map; sketches; short descriptive analyses

Cultural/social/political context

  • Brief explanation of culture, political economy, legal framework

Illustration: Bullet points, image, background notes


Local Climate

  • What are the climatic conditions at present? Have there been extreme weather events in the near past?
  • Which changes are expected? Is there any evidence?

Illustration: Table or time line


Analysis of vulnerability

  • If you consider these potential changes - which aspects/functions of your case study would be affected?

Illustration: Map/diagram/sketches/photos/background notes


Proposals for Climate Change Adaption

  • How could your case study area become more resilient to climate change?
  • Which measures would need to be taken to adapt to the new situation?
  • How could you assure sustainability of these measures?
  • Please describe 2-3 measures


Proposals for Climate Change Mitigation

  • Which measures would need to be taken to reduce greenhouse gas emissions and other drivers of climate change within your case study area?

Through our discussion,we consider that climate change mitigation in our case study area depend on not only the application of solar energy, but also any possible details of measures on sustainable use of resources, reducing the carbon footprint of individuals, creating urban carbon sinks, reducing the urban heat island effect and supporting biodiversity.

  • How could you assure sustainability of these measures?

The fundamental of a city is make up of people and infrastructure, no matter green infrastructure oder water-supply and drainage infrastructure and so on. The whole of production and consumption must be need energy to transform, reserve and produce. Therefore, energy theme is first and foremost and lang-term question to solve. Only through using all the available methods from two aspects, energy-consumption reduction and self sufficiency, to applying can area sustainable development, while the question of energy is always existing .

  • Please describe 2-3 measures

'In Ackermannbogen, inhabitants can don' t need one car, and if you ever do, there is a car-sharing station here in the district. You can live in a leafy green area in the city centre largely free of exhaust fumes, traffic and noise. This is a model that may turn out to be a blueprint for the future if the inhabitants do their bit.

'Rainwater collection device installed on each building,what's more connection with the watering system of urban green space,at the same time in the direction of the sunny construct the plant wall. As far as possible do not waste any little resource, as well as make most use of it.


Your scenario

  • How will this area look like in 2060?
    Heat.png

By 2060 Ackermannbogen will turn into a vibrant energy self-sufficient ZEROcarbon city, which is access to balance between energy demand and request. At same time it will create a optimized status among the quantity of inhabitants and houses and the job opportunities. 

  • Please forecast one potential future development taking climate change into account

The future development of climate change in this area will probably emphasize on maximized natural oxygen bar. What's more, according to the biodiversity is totally large increasing, it will become a excellent habitat for animal and vegetation. Furthermore, people live in a harmonious and sustainable environment, not to mention natural disasters.

What can be generalized from this case study?

  • Are there any important theoretical insights?

Ecological Evaluation

equivalent CO2-emission of solar installation 222 t/a

reduction related to condensing boiler system 213 t/a

reduction related to conventional district heating 150 t/a

  • Which research questions does it generate?

'Public acceptance: This case would need to develop a well communicated strategy to convince stakeholders of the option of 100%. Citizen should feel they are rewarded financially. A zero loan subsidy was suggested as an option for retrofitting households with energy efficiency and renewable measures.

'The financing tools: to take public&private partnerships between the city,banks, energy service companies and households to engaging

'The relationship between with other districts and regions is hardly balance, it will more and more people come Ackermannbogen working, there will be a large number of commuter. But you can not restrict the growth of the urban economy, so it must long-term consider the development city and neighborhood.

  • Short statement plus background notes

This case focuses on seasonal storage of the heat collected with solar panels and was lauched in 2007 after almost 10 years of preparation. This area is a perfect practical example of building a green energy system and an innovative concept of integrating solar heating machines with green space.

Presentation Slides

Image Gallery

References

Please add literature, documentations and weblinks

http://www.zaharias.net/wb-ackwohn.php?lg=en

http://www.docstoc.com/docs/46703256/Planning-Implementing-and-Monitoring-of-Large-Solar-Projects

http://www.eubia.org/uploads/media/EUSEW_CA-EUBIA_event-_summary.pdf