Cable Factory Vienna students' assignment: Difference between revisions
Jump to navigation
Jump to search
Heike.kaiser (talk | contribs) No edit summary |
Heike.kaiser (talk | contribs) No edit summary |
||
Line 4: | Line 4: | ||
<gallery caption=" " widths=" | <gallery caption=" " widths="300px" heights="200px" perrow="2"> | ||
Image:Cable factory01.JPG | Image:Cable factory01.JPG | ||
Image:Cable factory02.JPG | Image:Cable factory02.JPG |
Revision as of 13:01, 12 November 2009
An Urbanistic Development Process, a case study report developed by DI Eva Schwab, University of Natural Resources and Applied Life Sciences Vienna
contribution by: Daniel, Vesna, Benjamin, Susanne, Barbara