Green Infrastructure 2014 - Working Group D: Difference between revisions
Jureviciutee (talk | contribs) |
Jureviciutee (talk | contribs) |
||
Line 21: | Line 21: | ||
=== [[Green Infrastructure 2014 Working Group D - Case Study 1|Case Study 1]] === | === [[Green Infrastructure 2014 Working Group D - Case Study 1|Case Study 1]] === | ||
=== [[Green Infrastructure 2014 Group D - | === [[Green Infrastructure 2014 Group D - Erika Jureviciute. Former US Army areas in Heidelberg]] === | ||
Erika Jureviciute. Former US Army areas in Heidelberg | |||
=== [[Green Infrastructure 2014 Group D - Case Study 3|MARKLEN NAKUCI (Tirana Big Park and Artificial Lake)]] === | === [[Green Infrastructure 2014 Group D - Case Study 3|MARKLEN NAKUCI (Tirana Big Park and Artificial Lake)]] === |
Revision as of 18:31, 23 November 2014
--> Back to working group overview
Dear working group members. This is your group page and you will be completing the template gradually as we move through the seminar. Each member has an individual page for documenting his/her personal case. You can also access your template for assignment 4 (the joint design) from here. Good luck and enjoy your collaboration!
Assignment 2 - Lecture Concept Map
- The list with the group distribution shows you which lecture your group is supposed to document in the concept map format.
- Please add your collaborative concept map here by replacing the dummy image. Your map needs to have a new file name:
- Yourfilename.jpg
add your lecture title here by replacing this text
Assignment 3 - Green infrastructure potential in your environment
- Assigned: Tuesday, October 28
- Due: Monday, December 1
There is one template page for each group member. The case could be a specific site in direct vicinity or a larger area in your region. The objective is to identify structures that have the potential to become elements of a green infrastructure strategy.
Case Study 1
Green Infrastructure 2014 Group D - Erika Jureviciute. Former US Army areas in Heidelberg
MARKLEN NAKUCI (Tirana Big Park and Artificial Lake)
Case Study 4
Presentation Slides Assignment 3
- GI yourgroupname ass3 slide1.jpg
slide 1
- GI yourgroupname ass3 slide2.jpg
slide 2
- GI yourgroupname ass3 slide3.jpg
slide 3
- GI yourgroupname ass3 slide4.jpg
slide 4
Assignment 4 - Collaborative Green Infrastructure Design
- Assigned: Tuesday, December 2
- Due: Tuesday, January 26
Collaborative Design Working Group D
Presentation Slides Collaborative Design
- GI yourgroupname ass4 slide1.jpg
Analytical Drawings
- GI yourgroupname ass4 slide2.jpg
Projective Drawings
- GI yourgroupname ass4 slide3.jpg
Design Synthesis