Green Infrastructure 2014 - Working Group J: Difference between revisions

From Wikienfk5
Jump to navigation Jump to search
 
(4 intermediate revisions by 2 users not shown)
Line 10: Line 10:


<gallery caption=" " widths="200px" heights="150px" perrow="3">
<gallery caption=" " widths="200px" heights="150px" perrow="3">
Image:yourfilename.jpg|''add your lecture title here by replacing this text''
Image:Assignment2 groupj.jpg|''Urban greening in practice, London''
</gallery>
</gallery>


Line 22: Line 22:
=== [[Green Infrastructure 2014 Working Group J - Case Study 1|Schwarzwald-Germany,Negar Mehryar]] ===
=== [[Green Infrastructure 2014 Working Group J - Case Study 1|Schwarzwald-Germany,Negar Mehryar]] ===


=== [[Green Infrastructure 2014 Group J - Case Study 2|Case Study 2]] ===
=== [[Traditional water system, Nepal]] ===
 
=== [[Green Infrastructure 2014 Group J - Case Study 3|Case Study 3]] ===
=== [[Green Infrastructure 2014 Group J - Case Study 3|Case Study 3]] ===
=== [[Green Infrastructure 2014 Group J - Case Study 4|The Ensanche Neighborhood G. I. Plan. Valencia. Spain]] ===
=== [[Green Infrastructure 2014 Group J - Case Study 4|The Ensanche Neighborhood G. I. Plan. Valencia. Spain]] ===

Latest revision as of 18:04, 20 January 2015

--> Back to working group overview

Dear working group members. This is your group page and you will be completing the template gradually as we move through the seminar. Each member has an individual page for documenting his/her personal case. You can also access your template for assignment 4 (the joint design) from here. Good luck and enjoy your collaboration!


Assignment 2 - Lecture Concept Map

  • The list with the group distribution shows you which lecture your group is supposed to document in the concept map format.
  • Please add your collaborative concept map here by replacing the dummy image. Your map needs to have a new file name:

Assignment 3 - Green infrastructure potential in your environment

  • Assigned: Tuesday, October 28
  • Due: Monday, December 1

There is one template page for each group member. The case could be a specific site in direct vicinity or a larger area in your region. The objective is to identify structures that have the potential to become elements of a green infrastructure strategy.

Schwarzwald-Germany,Negar Mehryar

Traditional water system, Nepal

Case Study 3

The Ensanche Neighborhood G. I. Plan. Valencia. Spain

Presentation Slides Assignment 3

Assignment 4 - Collaborative Green Infrastructure Design

  • Assigned: Tuesday, December 2
  • Due: Tuesday, January 26

Collaborative Design Working Group J

Presentation Slides Collaborative Design