Green Infrastructure 2014 - Working Group G: Difference between revisions

From Wikienfk5
Jump to navigation Jump to search
 
(5 intermediate revisions by 2 users not shown)
Line 21: Line 21:
=== [[Green Infrastructure 2014 Working Group G - Case Study 1|Case Study 1]] ===
=== [[Green Infrastructure 2014 Working Group G - Case Study 1|Case Study 1]] ===
=== [[Green Infrastructure 2014 Group G - Case Study 2|Case Study 2]] ===
=== [[Green Infrastructure 2014 Group G - Case Study 2|Case Study 2]] ===
=== [[Green Infrastructure 2014 Group G - Belvedere study|Belvedere study]] ===
=== [[Green Infrastructure 2014 Group G - Case Study 4|Case Study 4]] ===


=== Presentation Slides Assignment 3 ===
=== Presentation Slides Assignment 3 ===
Line 46: Line 46:


<gallery caption=" " widths="150px" heights="150px" perrow="4">
<gallery caption=" " widths="150px" heights="150px" perrow="4">
Image:GI_yourgroupname_ass4_slide1.jpg|Analytical Drawings
Image:GI groupG ass4 slide1.JPG|Presentation
Image:GI_yourgroupname_ass4_slide2.jpg|Projective Drawings
Image:GI groupG ass4 slide2.JPG|Analytical Drawings
Image:GI_yourgroupname_ass4_slide3.jpg|Design Synthesis
Image:GI groupG ass4 slide3.JPG|Projective Drawings
Image:GI groupG ass4 slide4.JPG|Design Synthesis
</gallery>
</gallery>



Latest revision as of 18:56, 10 February 2015

--> Back to working group overview

Dear working group members. This is your group page and you will be completing the template gradually as we move through the seminar. Each member has an individual page for documenting his/her personal case. You can also access your template for assignment 4 (the joint design) from here. Good luck and enjoy your collaboration!


Assignment 2 - Lecture Concept Map

"Green Infrastructure and the EU" Lecture by Maria Beatrice Andreucci

Assignment 3 - Green infrastructure potential in your environment

  • Assigned: Tuesday, October 28
  • Due: Monday, December 1

There is one template page for each group member. The case could be a specific site in direct vicinity or a larger area in your region. The objective is to identify structures that have the potential to become elements of a green infrastructure strategy.

Case Study 1

Case Study 2

Case Study 4

Presentation Slides Assignment 3

Assignment 4 - Collaborative Green Infrastructure Design

  • Assigned: Tuesday, December 2
  • Due: Tuesday, January 26

Collaborative Design Working Group G

Presentation Slides Collaborative Design