Green Infrastructure 2014 - Working Group N: Difference between revisions

From Wikienfk5
Jump to navigation Jump to search
 
(3 intermediate revisions by one other user not shown)
Line 28: Line 28:
=== Presentation Slides Assignment 3 ===
=== Presentation Slides Assignment 3 ===


<gallery caption=" " widths="150px" heights="150px" perrow="4">
<gallery caption=" " widths="200px" heights="200px" perrow="4">
Image:Gi_assignment3_groupN-1.jpg|slide 1
Image:Gi_assignment3_groupN-1.jpg|slide 1
Image:Gi_assignment3_groupN-2.jpg|slide 2
Image:Gi_assignment3_groupN-2.jpg|slide 2
Line 39: Line 39:
Image:Gi_assignment3_groupN-10.jpg|slide 9
Image:Gi_assignment3_groupN-10.jpg|slide 9
Image:Gi_assignment3_groupN-11.jpg|slide 10
Image:Gi_assignment3_groupN-11.jpg|slide 10
Image:GI_yourgroupname_ass3_slide4.jpg|slide 11
Image:Gi_assignment3_groupN-12.jpg|slide 11
Image:GI_yourgroupname_ass3_slide4.jpg|slide 12
Image:Gi_assignment3_groupN-13.jpg|slide 12


</gallery>
</gallery>
Line 54: Line 54:


<gallery caption=" " widths="150px" heights="150px" perrow="4">
<gallery caption=" " widths="150px" heights="150px" perrow="4">
Image:GI_yourgroupname_ass4_slide1.jpg|Analytical Drawings
Image:GroupN_analytical.jpg|Analytical Drawings
Image:GI_yourgroupname_ass4_slide2.jpg|Projective Drawings
Image:GroupN_projective.jpg|Projective Drawings
Image:GI_yourgroupname_ass4_slide3.jpg|Design Synthesis
Image:GroupN_synthesis.jpg|Design Synthesis
</gallery>
</gallery>



Latest revision as of 16:06, 27 January 2015

--> Back to working group overview

Dear working group members. This is your group page and you will be completing the template gradually as we move through the seminar. Each member has an individual page for documenting his/her personal case. You can also access your template for assignment 4 (the joint design) from here. Good luck and enjoy your collaboration!


Assignment 2 - Lecture Concept Map

  • Green Infrastructure: concepts, perceptions and its use in planning Dr.Ian Mell


Green Infrastructure: concepts, perceptions and its use in planning Dr.Ian Mell


Assignment 3 - Green infrastructure potential in your environment

  • Assigned: Tuesday, October 28
  • Due: Monday, December 1

There is one template page for each group member. The case could be a specific site in direct vicinity or a larger area in your region. The objective is to identify structures that have the potential to become elements of a green infrastructure strategy.

Abdullah_case study 1, Saudi Arabia

Mateja Leljak _ Krapina, River Krapinica, Croatia

Elena Mihai- Querim-Tiracol Area, Tiracol River, Goa, India

Barbara Boschiroli - Cavenago d'Adda, Lodi, Adda river, Italy

Presentation Slides Assignment 3

Assignment 4 - Collaborative Green Infrastructure Design

  • Assigned: Tuesday, December 2
  • Due: Tuesday, January 26

Collaborative Design Working Group N- Bastia farms, Cavenago d'Adda, Lodi, Italy

Presentation Slides Collaborative Design